Case Study

Pertamina Hulu Mahakam utilizes machine learning to reduce property modeling time from 4 weeks to 4 days

March 01, 2022

Download PDF

Pertamina Hulu Mahakam utilizes machine learning to
reduce property modeling time from 4 weeks to 4 days

Pertamina Hulu Mahakam (PHM) successfully applied Machine Learning for Property Modeling, which is available in the DELFI cognitive E&P environment, to accelerate and improve the accuracy of 3D property modeling in its upstream operations. PHM conducted a proof-of-value project at its North Handil Field, to enable geomodelers to spend less time on geostatistical data analysis and parametrization, and more time analyzing property modeling results to improve well site selection and optimize the field development plan.

 

Download the PDF to read the case study